عنوان المقالة:Balancing Production Capacity and Demand through Aggregate Production Planning (app): A Case study in Baghdad Company for soft Drinks, Baghdad, Iraq Balancing Production Capacity and Demand through Aggregate Production Planning (app): A Case study in Baghdad Company for soft Drinks, Baghdad, Iraq
Based on the data witch researcher collected it from Production processes department in Baghdad Company for
soft drinks, there were six kinds of soft drink products (Pepsi, Miranda, 7up, green apple, shani, and lemon). There were
still shortages of production capacity in three products only (green apple, shani, lemon) in 2017. A company produced
zero units at several times from the year 2017 for these limit products (3 only). To overcome this problem, the purpose
of this research was to make Production planning & control consisting of: Aggregate production planning and forecasting
demand by weighted moving average method in 2018. The tested values show how Baghdad Company for soft drinks can
balancing between production capacity and demand of customers in the year 2018 through (first quarter only).
الملخص الانجليزي
Based on the data witch researcher collected it from Production processes department in Baghdad Company for
soft drinks, there were six kinds of soft drink products (Pepsi, Miranda, 7up, green apple, shani, and lemon). There were
still shortages of production capacity in three products only (green apple, shani, lemon) in 2017. A company produced
zero units at several times from the year 2017 for these limit products (3 only). To overcome this problem, the purpose
of this research was to make Production planning & control consisting of: Aggregate production planning and forecasting
demand by weighted moving average method in 2018. The tested values show how Baghdad Company for soft drinks can
balancing between production capacity and demand of customers in the year 2018 through (first quarter only).